DEO has unveiled plans to develop the UK North Sea Perth field by means of a subsea development produced back to a Floating Production, Storage and Offloading (FPSO) vessel. The Perth field lies in UK Blocks 15/21a and 15/21c in the Northern North Sea. The first discovery well in the Perth field was drilled in 1983, with subsequent appraisal wells drilled between 1992 and 1997.
展开▼