...
首页> 外文期刊>International Oil Daily >JX Nippon's Malaysian Field Delayed
【24h】

JX Nippon's Malaysian Field Delayed

机译:JX Nippon Malaysia Field延期

获取原文
获取原文并翻译 | 示例
           

摘要

Japan's JX Nippon is facing a delay of at least six months to the start-up of its 75%-owned Layang oil and gas field in Block SK10 off the Malaysian state of Sarawak (IOD May13'14). Sources said delivery of an anchor production facility for Layang, a leased floating production, storage and offloading (FPSO) vessel from Malaysian fabricator TH Heavy Engineering, will be delayed by at least six months. This will potentially push back first production from Layang, previously planned for the second quarter of this year, to late 2016 or even early 2017.
机译:日本的JX Nippon面临其在马来西亚砂拉越州SK10区块拥有75%所有权的Layang油气田的启动至少要推迟六个月(IOD May13'14)。消息人士称,马来西亚制造商TH Heavy Engineering租用的浮式生产,储存和卸货(FPSO)船为Layang交付了锚式生产设施,将至少延迟六个月。这将有可能将原定于今年第二季度计划的Layang的第一批生产推迟至2016年底甚至2017年初。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号