首页> 外文期刊>International Oil Daily >BP Sees Greater Potential for Block 61 Gas Output in Oman
【24h】

BP Sees Greater Potential for Block 61 Gas Output in Oman

机译:BP认为阿曼61区块天然气输出潜力更大

获取原文
获取原文并翻译 | 示例
       

摘要

Oman’s Block 61 has the potential to deliver two to three times the 1 billion cubic feet per day of nonassociated gas currently under consideration by BP, the company’s manager in the country told a conference in Muscat on Tuesday. BP is currently conducting an enhanced well test on what it is now saying could be the first phase of development in the block. The current Kazzan play — on which BP will make a final investment decision in 2013 — would develop about 7 trillion-8 trillion cubic feet of the estimated 90 Tcf- 100 Tcf of nonassociated gas in place.
机译:阿曼在该国的经理周二在马斯喀特举行的一次会议上说,阿曼的61号区块有潜力输送目前正在考虑的BP每天10亿立方英尺非伴生气的2到3倍。 BP目前正在对目前所说的可能是该区块开发的第一阶段进行强化的试井。 BP将在2013年做出最终投资决定,目前的Kazzan项目将在估计的90 Tcf-100 Tcf的非伴生天然气中开发约7万亿至8万亿立方英尺。

著录项

  • 来源
    《International Oil Daily》 |2011年第246期|共1页
  • 作者

    Emily Meredith;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 12:59:51

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号