首页> 外文期刊>International Oil Daily >Russia Starts Work on Second Phase of Massive Espo Oil Pipeline
【24h】

Russia Starts Work on Second Phase of Massive Espo Oil Pipeline

机译:俄罗斯开始大规模的埃斯波石油管道第二阶段的工作

获取原文
获取原文并翻译 | 示例
       

摘要

Russian pipeline monopoly Transneft has started work on the second phase of its massive East Siberia-Pacific Ocean (Espo) pipeline, despite skepticism that there will be enough crude oil to fill the line. The first phase of the line, which opened late last year, runs nearly 2,700 kilometers from Taishet in the Irkutsk region of Eastern Siberia to Skovorodino, 68 km from the Chinese border, and has a capacity of 600,000 barrels per day. The 2,100 km second phase will link the existing line to a new export outlet, Kozmino, on the Pacific coast (IOD Dec.29,p1).
机译:俄罗斯管道垄断公司Transneft已开始在其大型东西伯利亚-太平洋(Espo)管道的第二阶段开展工作,尽管怀疑是否会有足够的原油来填充该管道。该生产线的第一阶段于去年年底开通,从西伯利亚东部伊尔库茨克地区的塔伊谢特(Taishet)到斯科沃罗迪诺(Skovorodino),距中国边境68公里,全长近2700公里,每天的生产能力为60万桶。第二阶段长2100公里,将现有线路连接到太平洋海岸的新出口出口Kozmino(IOD,12月29日,p1)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号