...
首页> 外文期刊>Arab Oil & Gas >First Solar to Supply PV Solar Panels for 200-MW Phase 2 of the Mohammed bin Rashid Al Maktoum Solar Park
【24h】

First Solar to Supply PV Solar Panels for 200-MW Phase 2 of the Mohammed bin Rashid Al Maktoum Solar Park

机译:第一家太阳能公司将为穆罕默德·本·拉希德·阿勒马克图姆太阳能公园的200兆瓦第二阶段提供光伏太阳能电池板

获取原文
获取原文并翻译 | 示例
           

摘要

First Solar of the United States has been awarded a contract by Dubai Electricity and Water Authority (DEWA) for the supply of photovoltaic (PV) solar modules for phase 2 of the development of the Mohammed bin Rashid Al Maktoum Solar Park, which will add capacity of 200 MW. At the beginning of this year DEWA signed a contract with a consortium composed of Saudi Arabia’s International Company for Water and Power Projects (ACWA Power) and the Spanish company TSK Energia e Desenvolvimento for the execution of this phase (AOG, 1 Feb., 2015).
机译:美国第一太阳能公司获得了迪拜电力和水务局(DEWA)的合同,为穆罕默德·本·拉希德·阿勒马克图姆太阳能公园的第二期开发提供光伏(PV)太阳能电池组件200兆瓦。今年年初,DEWA与沙特阿拉伯国际水电项目公司(ACWA Power)和西班牙TSK Energia e Desenvolvimento公司组成的财团签署了一项合同(AOG,2015年2月1日) )。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号