【24h】

DREAMING BIG

机译:大梦

获取原文
获取原文并翻译 | 示例
           

摘要

Coal India Limited (CIL) dreams of producing one-billion tons of coal a year by 2020, and, as the sixth-largest miner in the world, having big dreams is not unusual. However, if past performance is seen as an indicator of future performance, then it has a lot of sceptics to prove wrong. "CIL's major challenge is to meet the rising demand from the power sector... and this is how the dream of achieving the one-billion-tons-a-year coal production [target] began," the miner states in its Roadmap for Enhancement of Coal Production.
机译:印度煤炭公司(CIL)的梦想是到2020年每年生产10亿吨煤炭,而作为全球第六大矿业公司,大梦想并不罕见。但是,如果过去的表现被视为未来表现的指标,那么很多怀疑论者就会证明自己是错误的。该矿商在其《路线图》中指出:“ CIL的主要挑战是满足电力部门不断增长的需求……这就是实现年产10亿吨煤炭[目标]的梦想的开始之路。”提高煤炭产量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号