首页> 外文期刊>三菱重工技報 >Modification Design and Operation Results of Boiler for Repowering of Chubu Electric Power Co. Inc. Chita Units No.1 & &2
【24h】

Modification Design and Operation Results of Boiler for Repowering of Chubu Electric Power Co. Inc. Chita Units No.1 & &2

机译:中部电力赤塔1、2号机组再利用锅炉的改造设计及运行结果

获取原文
获取原文并翻译 | 示例
           

摘要

Attention has been drawn to using the combined cycle in existing steam power plants and repowering gas turbines as an effective power generation system capable of increasing power output and improving plant efficiency. For repowering it is necessary to pay attention to many aspects, which is different from usual steam power plants in the modification of existing boilers. The authors have designed and developed a system for modification of the existing boiler in a gas turbine exhaust gas re-combustion combined cycle project for repowering in Chubu Electric Power Co., Inc. Chita units No.1 &2. In this report, the design descriptions and the successful operation results of this boiler are described.
机译:已经引起了人们的注意,在现有的蒸汽发电厂中使用联合循环和对燃气轮机重新供电是一种有效的发电系统,能够增加功率输出并提高电厂效率。为了重新供电,有必要注意很多方面,这与常规蒸汽发电厂的现有锅炉不同。作者已经设计并开发了一种系统,用于对中部电力公司赤塔1号和2号机组的燃气轮机废气再燃烧联合循环项目中的现有锅炉进行改造,以进行供电。在此报告中,描述了该锅炉的设计说明和成功运行的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号