The Union Section of Anglo Platinum is situated +- 18 km west of the town of Northam on the north-western rim of the Bushveld Igneous Complex. Both the Merensky and UG2 reefs are mined.Support of the Merensky stoping areas with rock bolts is specifically problematic due to the stoping width restrictions varying around 90 cm.The installation equipment of in-stope rock bolts and the effectiveness thereof in the Merensky stoping areas was critically evaluated.In order to do this a background research on the need for better on-the-face support had to be conducted. The need for improving the rock bolt drilling and the equipment had to be investigated and the financial implications and justifications for the improved equipment examined.To conduct the search an overall study was done on the rock falls and safety aspects throughout the platinum industry in South Africa and specifically Union Section. It was found that most of the rock falls in the Merensky stoping areas of which +- 70 percent are less than 1.2 min thickness generally occurs within 4 m from the face and causes +- 60 percent of the in-stope injuries.Serious shortcomings had been identified with respect to the airleg, rock drill machine and the drill steels used in the drilling of the rock bolt holes. Through experimentation, using a testing frame built for this purpose on surface and with the co-operation of mine staff and suppliers, a number of possible modifications were identified and tested. This resulted in the final product with which it was possible to drill a 1.2 m hole in the hangingwall of the stopes ranging with an angle to the hanging from 90 deg for a 90 cm stoping width and 67 deg for a 80 cm stoping width.It is confidently concluded that this system will effectively improve the total face support and result in a substantial reduction of rock falls and consequently the occurrence of injuries and fatalities in the Merensky stoping areas.The installation of rock bolts on the face with the modified drilling equipment will increase the direct support, but the system has a potential of a substantial reduction in the profile stick support density and an increase in productivity in the stoping areas due to fewer occurrences of rock falls.It was finally concluded that effective modifications to the drilling equipment for rock bolt In-hole drilling could be made and the installation thereof in the stope face is adequately justified.
机译:盎格鲁铂金联合区位于Northam镇以西18公里处,位于布什维尔德火成岩联合体的西北边缘。梅伦斯基(Merensky)和UG2礁均被开采。由于锚固宽度限制在90厘米左右,因此用锚杆支撑梅伦斯基制止区特别成问题。为此,必须对需要更好的面部支持进行背景研究。必须研究改进岩石锚杆钻探和设备的必要性,并研究改进设备的财务影响和合理性。为进行搜索,对南非白金行业的岩石崩塌和安全性进行了全面研究特别是联合科。已发现大多数岩石落在梅伦斯基采煤区,其中+-70%的厚度小于1.2分钟,通常发生在距面部4 m的范围内,并造成+-60%的采煤中伤。已针对气腿,凿岩机和用于钻凿锚杆孔的钻钢进行了鉴定。通过试验,使用为此目的而构建的测试框架,并在矿山员工和供应商的合作下,确定并测试了许多可能的修改。这样就产生了最终产品,可以在采煤场的悬挂壁上钻一个1.2 m的孔,其相对于悬挂角度为90度(90 cm的停止宽度)和67度(80 cm的停止宽度)。可以肯定地说,该系统将有效地改善工作面的整体支撑力,并大大减少落石的发生,从而减少Merensky采煤区的伤亡事故。虽然增加了直接支撑,但由于减少了岩石崩塌的发生,该系统有可能大幅降低轮廓杆支撑密度并提高停放区的生产率。可以进行钻孔钻孔,并且充分合理地将其安装在采场面上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号