The West Driefontein reclamation carbon-in-pulp plant; pilot plant testwork, design, commissioning and optimization

机译:West Driefontein填海制浆造纸厂;中试工厂的测试工作,设计,调试和优化

获取原文
获取原文并翻译 | 示例
           

摘要

Driefontein Consolidated Limited has a proud history in the South African gold mining industry dating back to March 1945 with the formation of the West Driefontein Gold Mining Company. The reclamation gold plant at West Driefontein was originally built as a uranium recovery plant in 1970. With the collapse of the uranium oxide yellow cake market, the uranium plant was dosed in 1988 and successfully converted into a gold plant, recovering gold from repulped tailings dams.The West Driefontein Reclaim plant utilized milling, leaching, conventional rotary vacuum filtration and cementation to recover the gold at a rate of 200,000 dry tons per month. The No.1 tailings dam (at a head grade of 0,8 Au g/t) began to near the end of its life during 1996, and the next slimes dams to be treated, the No.2 tailings dam (at a lower head grade of 0.56 Au g/t) was found too marginal for reprocessing using the filtration technology.Alternate technologies were investigated, particularly the carbon-in-pulp (UP) plant based on the Anglo-American Corporation (AAC) pump-cell technology at the Vaal Reels Exploration and Mining Company's East gold plant which was operating profitably at lower head grades. The AAC pump-cell technology is based on the carousel mode of operation.The suitability of UP technology for the West Driefontein Reclaim plant was investigated using a pilot plant pump-cell supplied by Kemix.The data gathered were utilized in sizing a full scale AAC pump-cell plant This plant was motivated, built and commissioned on the 22nd of November 1996. Incorporating 6 eighty cubic metre AAC pump-cells. The West Driefontein Reclaim plant initially treated repulped slimes dam material. A subsequent change of feed material to current arisings (from the main gold plant) occurred in 1997 in order to convert mills for waste rock treatment Currently the reclaim plant treats a combination of current arisings and waste rock (milled at the reclaim site).The new UP plant replaced twenty A comparison between the costs was undertaken, as well as a pc plant to determine its flexibility in throughput, pulp density, gold input, UP, and the rate of carbon movement.
机译:Driefontein Consolidated Limited在南非的金矿开采行业拥有悠久的历史,其历史可追溯到1945年3月,当时成立了West Driefontein金矿公司。西德里方方(West Driefontein)的回收金厂最初是在1970年建成的,当时是铀回收厂。随着氧化铀黄饼市场的崩溃,铀厂于1988年配药并成功转变为金厂,从碎浆尾矿坝中回收黄金。 。West Driefontein回收厂利用研磨,浸出,常规旋转真空过滤和胶结作用,每月回收黄金20万吨。 1号尾矿坝(水头等级为0.8 Au g / t)在1996年接近寿命尽头时,下一个要处理的史莱姆水坝,即2号尾矿坝(下部)头级0.56 Au g / t)太低,无法使用过滤技术进行后处理。研究了其他技术,特别是基于英美公司(AAC)泵-电池技术的纸浆制碳(UP)厂在Vaal Reels勘探和采矿公司的East金厂工作,该厂以较低的头等品位运营获利。 AAC泵单元技术基于轮播操作模式,使用Kemix提供的中试泵单元研究了UP技术在West Driefontein Reclaim工厂中的适用性,并利用收集到的数据对全尺寸AAC进行了规模分析泵室工厂该工厂于1996年11月22日动工,建造和调试。该工厂装有6台80立方米AAC泵室。 West Driefontein回收厂最初处理的是重新制浆的泥浆坝材料。随后的进料发生了变化(从主要的金矿中产生),以便将工厂转换成废石处理厂。目前,该回收厂处理的是现成和废石的混合物(在回收场进行了碾磨)。新的UP工厂取代了二十个工厂。在成本之间进行了比较,并确定了一个PC工厂,以确定其在生产能力,纸浆密度,黄金输入量,UP和碳移动速率方面的灵活性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号