...
首页> 外文期刊>Journal Of The South African Institute Of Mining & Metallurgy >Incorporation of rehabilitation cost into the optimum cut-off grade determination
【24h】

Incorporation of rehabilitation cost into the optimum cut-off grade determination

机译:将康复费用纳入最佳截止品位的确定中

获取原文
获取原文并翻译 | 示例
           

摘要

Determination of the optimum cut-off grades is one of the most important aspects of mine production planning. A cut-off is a grade below which we choose not to process material. This material is treated as waste and dumped. Dumping waste is accompanied by the rehabilitation cost which will affect the overall cost of final production and also the optimum cut-off grade. Rehabilitation cost is the cost per ton of rehabilitating material of a particular type of rock after it has been dumped as waste. One of the most popular algorithms for determination of the optimum cut-off grade is Lane's method. Lane formulated the cut-off grade optimization, but he did not consider rehabilitation cost during the optimization process. This cost item should be evaluated first, and then considered during the cut-off grade optimization process. In this paper the rehabilitation cost is inserted directly into the cut-off grade optimization process using Lane's theory. The cut-off grades obtained using the suggested method will be more realistic than ones using the original form of Lane's formulations.
机译:确定最佳边界品位是矿山生产计划中最重要的方面之一。临界值是一个等级,在该等级以下,我们选择不处理材料。该材料被当作废物丢弃。倾倒废料的过程中会涉及到修复成本,这将影响最终生产的总成本以及最佳分界线。修复成本是指将特定类型的岩石作为废物倾倒后,每吨修复材料的成本。确定最佳截止等级的最流行算法之一是莱恩方法。莱恩制定了临界品位优化,但他没有在优化过程中考虑恢复成本。该成本项目应首先进行评估,然后在截止品级优化过程中予以考虑。在本文中,使用Lane的理论将恢复成本直接插入截止品级优化过程中。使用建议的方法获得的临界品位将比使用莱恩公式的原始形式的品位更高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号