首页>
外文期刊>Cokemaking International
>Design and Construction of Coke Ovens by TKEC on the Non-Recovery Plant of Illawarra Coke Company in Coalcliff, New South Wales, Australia
【24h】
Design and Construction of Coke Ovens by TKEC on the Non-Recovery Plant of Illawarra Coke Company in Coalcliff, New South Wales, Australia
Now, that the first two Non-Recovery Technology ovens have been built and commissioned, ThyssenKrupp EnCoke (TKEC) can demonstrate the advantages of this technology as compared with the existing Illwarra Coke Company (ICC) ovens or the technology of competitors in daily operation. On the part of ICC, the ovens shall the run in a separate pushing cycle utilizing 48 hours coking time, meaning that the productivity will be significantly increased. In normal operation, these ovens will also be utilized for carbonization tests which will prove achievalbe coke qualities - which are already very good with the existing ICC plant - and provide interested clients with the opportunity to test their own blends in these new technology ovens.
展开▼