Modernization of Automatic Systems in Coke Section No. 2 of the Severstal Plant

机译:谢韦尔工厂2号炼焦厂自动系统的现代化

获取原文
获取原文并翻译 | 示例
           

摘要

In 2000, in coking section No. 2 of the "Severstal" byproduct coke plant (Cherepovetsk metallurgical plant) an automatic process control system (ACS) construction was begun for four coke-oven batteries Nos. 7-10 and two dry coke quenching installations Nos. 2 and 3. The work was started after the implementation of the main subsystems of the automatic control system in the coking section of batteries Nos. 5 and 6. The automatic process control system, which was partly implemented in those coke-oven batteries, was highly efficient. It should be pointed out that none of the coke-oven batteries in CIS countries is equipped with such an automatic system of control of the coking process of this level.
机译:2000年,在“ Severstal”副产品焦炭厂(Cherepovetsk冶金厂)的2号焦化段中,开始为四个7-10号焦炉电池组和两个干式焦炭淬火装置建造自动过程控制系统(ACS)在实施2号和3号电池焦化部分中的自动控制系统的主要子系统之后,这项工作就开始了。自动过程控制系统部分地在那些焦炉电池中实现。 ,效率很高。应当指出,独联体国家的焦炉电池都没有配备这种水平的焦化过程自动控制系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号