首页> 外文期刊>Journal of the Institution of Engineers (India). Mining Engineering Division >A Critical Case Study on Draglines Operating in Vertical Tandem in a Coal Mine
【24h】

A Critical Case Study on Draglines Operating in Vertical Tandem in a Coal Mine

机译:煤矿拉铲垂直串连作业的关键案例研究

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The tandem operation of draglines is understood to enhance the production and productivity related aspects in a surface mine. Keeping the importance of popularly used vertical tandem operation of draglines, the present study has been undertaken in a large Indian opencast coalmine in order to critically investigate the vertical tandem operation of draglines on a moderately hard and high (about 42 m) sandstone bench overlying 15 m thick coal seam. The study has revealed that although preparation of balancing diagram for planning of dragline operations is the first and the most important process, the actual implementation of the productivity parameters, as stipulated by the balancing diagram, need to be rigorously monitored in the field. The chief productivity parameters to be closely monitored, and, which, significantly affect the performance of dragline operations have been identified as actual efficiency of draglines operation, cycle time, availability, utilisation, linear advance rate and the rehandling percentage.
机译:拉铲的串联操作被理解为增强露天矿的生产和生产率相关方面。为了保持拉铲的垂直串联操作的重要性,本研究是在一个印度大型露天煤矿中进行的,目的是严密研究覆盖在15个中等硬度和高(约42 m)砂岩台阶上的拉铲的垂直串联操作。米厚的煤层。研究表明,尽管为拉铲铲作业计划准备平衡图是首要也是最重要的过程,但平衡图所规定的生产率参数的实际实施仍需要在现场进行严格监控。已确定要密切监视的,并会严重影响拉铲作业性能的主要生产力参数,是拉铲作业的实际效率,周期时间,可用性,利用率,线性推进率和重新处理百分比。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号