...
首页> 外文期刊>Journal of the experimental analysis of behavior >Briefly delayed reinforcement effects on variable-ratio and yoked-interval schedule performance
【24h】

Briefly delayed reinforcement effects on variable-ratio and yoked-interval schedule performance

机译:短暂延迟的钢筋对可变比率和约束间隔进度性能的影响

获取原文
获取原文并翻译 | 示例
           

摘要

Most investigations of briefly delayed reinforcement have involved schedules that arrange a time-plusresponse requirement. The present experiment examined whether briefly delaying reinforcement on schedules that have a ratio requirement differs from results with schedules that have a time-plus-response requirement. Four pigeons responded on a two-component multiple schedule. One component arranged a variable-ratio (VR) 50 and the other a variable-interval (VI) schedule in which the distribution of reinforcers was yoked to the preceding VR schedule. Across a series of conditions, delays were imposed in both schedules. These delays were brief (0.25- or 0.5-s) unsignaled delays and, as control conditions, a 5-s unsignaled delay and a 0.5-s delay signaled by a blackout of the chamber. In the yoked-VI component, the brief unsignaled delay increased response rates in six of nine opportunities and increased the proportion of short interresponse times (IRTs) (<0.4 s) in eight of nine opportunities. In the VR component, the brief unsignaled delay increased response rates and the proportion of short IRTs in only two of nine opportunities. For two of the three pigeons that were exposed to the 5-s unsignaled delay, response rates and the proportion of short IRTs decreased in both of the components. The 0.5-s signaled delay did not systematically change response rates nor did it change the distribution of short IRTs relative to the immediate reinforcement condition. The results replicate effects reported with time-based schedules and extend these observations by showing that changes commonly observed in VI performance with briefly delayed reinforcement are not characteristic of VR responding.
机译:大多数对短暂延迟加固的研究都涉及安排时间加响应要求的进度表。本实验研究了在具有比率要求的进度计划中短暂延迟钢筋是否与具有时间加响应要求的进度计划的结果不同。四只鸽子按照两部分组成的多个时间表做出反应。一个组件安排了一个可变比率(VR)50,另一个组件安排了一个可变间隔(VI)计划,其中钢筋的分配与先前的VR计划挂钩。在一系列条件下,两个时间表都被延迟。这些延迟是短暂的(0.25或0.5 s)无信号延迟,作为控制条件,有5 s的无信号延迟和0.5 s的延迟(通过暗室信号通知)。在轭VI组件中,短暂的无信号延迟增加了九个机会中的六个机会的响应率,并增加了九个机会中的八个机会的短响应时间(IRT)(<0.4 s)的比例。在VR组件中,短暂的无信号延迟增加了响应速度,而短IRT的比例仅占九个机会中的两个。对于暴露在5秒内无信号延迟的三羽鸽子中的两羽,两部分的响应率和短IRT的比例均下降。 0.5 s的信号延迟既没有系统地改变响应率,也没有改变相对于立即加固条件的短IRT的分布。该结果复制了基于时间的时间表所报告的效果,并通过显示通常短暂表现为增强的VI性能的变化不是VR响应的特征来扩展这些观察结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号