首页> 外文期刊>Journal of Petroleum Science & Engineering >Casing cementing with half warm-up for thermal recovery wells
【24h】

Casing cementing with half warm-up for thermal recovery wells

机译:热采井的套管套管固井半预热

获取原文
获取原文并翻译 | 示例
       

摘要

Thermal recovery is a very common and effective method for producing heavy oil. Casing failure is a very serious problem in thermal recovery wells. In some oilfields, more than 95% of thermal recovery well's casing was failed due to thermal stresses. In the steam injection process, the casing is heated by steam. Change of casing temperature produces thermal stresses in the casing. The casing deforms when stresses exceed yield point of its material. If using conventional cementing technology for thermal recovery wells, the casing deforms due to thermal stresses in steam injection process. Technologies conventional used to protect the casing from failure for thermal recovery wells are ineffective theoretically. Casing cementing with half warm-up for thermal recovery wells refers to heat payzone production casing to a certain temperature and makes it expand in cement slurry solidifying period. Calculations show that casing cementing with half warm-up performs greater safety coefficient during the whole production cycle and no plastic deformation. This technology will be an important method to prolong thermal recovery well's casing life.
机译:热采是生产重油的非常普遍和有效的方法。套管故障是热采井中非常严重的问题。在某些油田,由于热应力,超过95%的热采井套管破裂。在蒸汽注入过程中,外壳被蒸汽加热。套管温度的变化会在套管中产生热应力。当应力超过其材料的屈服点时,套管会变形。如果将常规固井技术用于热采井,则套管会因注汽过程中的热应力而变形。理论上,用于保护套管免受热采井破坏的常规技术在理论上是无效的。热采井半预热套管固井是指将热产层套管推至一定温度,使其在水泥浆凝固期膨胀。计算表明,在整个生产周期中,半预热的套管固井具有更大的安全系数,并且没有塑性变形。该技术将是延长热采井套管寿命的重要方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号