Differences between Calculated and Measured Long-Term Deflections in a Prestressed Concrete Girder Bridge

机译:预应力混凝土梁桥的长期挠度计算值与实测值之间的差异

获取原文
获取原文并翻译 | 示例
           

摘要

The monitoring of five precast, prestressed bridge girders during fabrication and service provided the opportunity to observe changes in camber over time. These camber variations were compared with corresponding strain and temperature measurements. Each of the girders was cast outside during the winter. As a result, the cold ground acted as a heat sink, and a significant temperature gradient existed during curing of each of the instrumented girders. These temperature gradients are believed to have caused the wide range in the short- and long-term cambers. A procedure to calculate the effect that curing temperatures have on girder camber is presented. In addition. the measured camber values are compared with predicted values using the multiplier method, improved multiplier method, and a detailed time-step method. It was found for the long-span girders that the measured camber values were on average within 10% of the predicted values using the detailed time-step method, but ranged from 22% lower to 27% higher for the simpler methods.
机译:在制造和维修过程中对五个预制的预应力桥梁进行监测,为观察拱形随时间的变化提供了机会。将这些外倾变化与相应的应变和温度测量值进行了比较。每个大梁在冬季都被抛在了外面。结果,冷的地面充当了散热器,并且在固化每个大梁的过程中存在明显的温度梯度。这些温度梯度被认为在短期和长期外倾角中引起了很大的变化。提出了计算固化温度对梁弯度影响的方法。此外。使用乘数法,改进的乘数法和详细的时间步长法将测得的弯度值与预测值进行比较。对于大跨度大梁,发现使用详细的时间步长法测得的弯度值平均在预测值的10%以内,但对于较简单的方法,其测量值在22%至27%的范围内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号