首页> 外文期刊>Journal of Petroleum Technology >Material and Completion-Equipment Selection for an HP/HT Sour-Gas-Field Development in Indonesia
【24h】

Material and Completion-Equipment Selection for an HP/HT Sour-Gas-Field Development in Indonesia

机译:印度尼西亚HP / HT酸性气田开发的材料和完井设备选择

获取原文
获取原文并翻译 | 示例
           

摘要

The Lematang Block in South Central Sumatra has estimated total reserves of 330 Bscf, with an expected production life of 10 years. Wells in this field contain 32% CO2 and 100 ppm H2S, have a bottomhoie pressure (BHP) of 10,500 psi, and have a bottomhoie temperature (BHT) of 408°F. The initial two wells were completed by the previous operator using 22Cr tubulars and 13Cr accessories. However, operational difficulties from material deterioration were identified. Optimization of completion durability considering economics was of high concern when selecting materials and completion-tool designs.
机译:苏门答腊中南部的Lematang区块估计总储量为330 Bscf,预期生产寿命为10年。此字段中的井包含32%的CO2和100 ppm的H2S,井底压力(BHP)为10,500 psi,井底温度(BHT)为408°F。最初的两口井由先前的操作人员使用22Cr钢管和13Cr附件完成。但是,发现了由于材料恶化而造成的操作困难。在选择材料和完井工具设计时,考虑到经济因素,优化完井耐久性非常重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号