首页> 外文期刊>Journal of Petroleum Technology >30 Years of Successful High-Pressure Air Injection: Performance Evaluation of Buffalo Field, South Dakota
【24h】

30 Years of Successful High-Pressure Air Injection: Performance Evaluation of Buffalo Field, South Dakota

机译:高压空气注入成功30年:南达科他州布法罗油田的性能评估

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The Buffalo field enhanced-oil-recbvery (EOR) project is the oldest still-active air-injection project in the USA. Laboratory studies (combustion-tube, miscibility-pressure, and swelling tests for various CO2/N2 mixtures) and feasibility studies including air-injectivity testing were completed in mid-1977. The result of the pilot test was promising, and the 2,240-acre Buffalo Red River Unit (BRRU) was formed in November 1978. Technical aspects of the Buffalo EOR project are presented, reviewing laboratory studies, production performance (1978-2009), and the effect of short-radius horizontal drilling.
机译:布法罗油田增油技术(EOR)项目是美国历史最悠久的仍处于活跃状态的注气项目。实验室研究(燃烧管,混溶压力和各种CO2 / N2混合物的溶胀测试)以及包括空气注入性测试在内的可行性研究已于1977年中期完成。中试的结果令人鼓舞,1978年11月组建了2240英亩的布法罗红河单位(BRRU)。介绍了布法罗EOR项目的技术方面,回顾了实验室研究,生产性能(1978-2009)和短半径水平钻孔的效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号