...
首页> 外文期刊>Journal of Petroleum Technology >Tool Enables One-Trip Completions in Multiple Deepwater Pay Intervals
【24h】

Tool Enables One-Trip Completions in Multiple Deepwater Pay Intervals

机译:该工具可在多个深水支付间隔中实现一键完成

获取原文
获取原文并翻译 | 示例
           

摘要

When designing deepwater wells with long or multiple pay zones, completion specialists face economic and technical problems whose solutions are often in conflict. Typically, these long pay zones include variations in fracture pressures, permeability, or other reservoir parameters. In trying to stimulate the entire length as one zone, it can be difficult to manage the many stimulation requirements, such as volume, rate, and pressure factors. The result can be poor reservoir coverage and uneconomic production. On the other hand, traditional multizone sandface completions can impair well economics because of the rig time required.
机译:当设计具有长或多个产油区的深水井时,完井专家会面临经济和技术问题,其解决方案通常会产生冲突。通常,这些长产层包括裂缝压力,渗透率或其他储层参数的变化。在尝试将整个长度作为一个区域进行刺激时,可能难以管理许多刺激要求,例如体积,速率和压力因子。结果可能导致储层覆盖率低和生产不经济。另一方面,由于所需的钻机时间,传统的多区砂岩完井可能会损害经济性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号