首页> 外文期刊>Journal of Petroleum Technology >Cementing a Long Horizontal Wellbore Using CT Squeeze Technology
【24h】

Cementing a Long Horizontal Wellbore Using CT Squeeze Technology

机译:使用CT挤压技术固井长水平井眼

获取原文
获取原文并翻译 | 示例
       

摘要

Coiled-tubing (CT) cementing has been used widely and has been highly successful for remedial squeeze and plugback operations for more than 20 years.However,most of these wells had deviations less than 90°.A long horizontal well in the Alpine field on the North Slope of Alaska was drilled early in the development phase and was out of pattern.The well required a plugback and sidetracking to maintain desired off-take strategy.On the basis of the successful CT squeeze program in Alaska,the decision was made to use CT cement-squeeze technology to seal the lateral portion of the well-bore and leave a cement base for subsequent sidetracking operations.
机译:螺旋管固井(CT)固井技术已被广泛使用,在补救性挤压和回填作业中已取得20多年的成功,但其中大多数井的偏差小于90°。在开发阶段初期就钻探了阿拉斯加北坡,该井不合时宜。该井需要进行插拔和侧钻,以维持所需的采空策略。在成功完成阿拉斯加CT挤压计划的基础上,做出了决定使用CT水泥挤压技术来密封井眼的侧向部分,并留出水泥基础以用于后续的侧钻作业。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号