Rigless coiled-tubing-unit (CTU) interventions can be effective in returning to production wells that have lost electrical-submersible-pump (ESP) efficiency because of organic, inorganic, or mixed scale deposits. Such operations extended the average ESP run life from 40 to 140 days and eliminated the need for workover (WO) rigs. A heavy-crude viscosity reducer (HCVR) is recommended as part of these treatments, to improve the cleanup process.
展开▼