首页> 外文期刊>Journal of Petroleum Technology >Wellbore-stability simulation for underbalanced drilling in highly depleted reservoirs
【24h】

Wellbore-stability simulation for underbalanced drilling in highly depleted reservoirs

机译:高耗油藏欠平衡钻井的井筒稳定性模拟

获取原文
获取原文并翻译 | 示例
           

摘要

The need to increase productivity by reducing formation damage during drilling is the aim of underbalanced drilling technology. The proposed solution is to drill with mud having an equivalent circulating density (ECD) less than the formation pore pressure and to avoid contact of drilling fluid with the formation. In highly depleted reservoirs, pore ressures can be very low. Analysis hsowed that horizontal wells could be drilled with an underbalanced system with a low instability risk. ECD values as low as 2.0 lbm/gal were used to drill wells with no wellbore instability problems reported. Production tests showed large improvements in well productivity indices compared with conventional overbalanced drilling.
机译:通过减少钻井过程中的地层损伤来提高生产率的需求是欠平衡钻井技术的目的。提出的解决方案是用等效循环密度(ECD)小于地层孔隙压力的泥浆进行钻探,并避免钻井液与地层接触。在高度枯竭的储层中,孔隙度可能非常低。分析表明,水平井可以使用失衡风险低的欠平衡系统进行钻探。低至2.0 lbm / gal的ECD值被用于钻探井,没有报告井眼不稳定的问题。生产测试表明,与常规的超平衡钻井相比,井的生产率指数有了很大的提高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号