Arkansas Supreme Court: Turk dispute must go back to Public Service Commission

机译:阿肯色州最高法院:土耳其人争议必须退回公共服务委员会

获取原文
获取原文并翻译 | 示例
           

摘要

The Arkansas Supreme Court, in a victory for Southwestern Electric Power and its 600-MW John W. Turk Jr. coal-fired power plant under construction in Hempstead County, ruled the Hempstead County Hunting Club jumped the gun when it sued the company in federal court last year in an effort to halt the $1.7 billion project. In a May 26 decision, the high court said the club should have raised its objections first with the Arkansas Public Service Commission before filing the federal lawsuit. The court's vote was 3-0, with two justices not participating.
机译:阿肯色州最高法院为西南电力公司及其在亨普斯特德县正在建设的600兆瓦约翰·特克小燃煤电厂的胜利,裁定当亨普斯特德县狩猎俱乐部在联邦法院起诉该公司时,他跳了枪。去年,法院试图终止这个耗资17亿美元的项目。高等法院在5月26日的裁决中说,俱乐部在提起联邦诉讼之前,应该先向阿肯色州公共服务委员会提出反对意见。法院的投票是3-0,两名法官没有参加。

著录项

  • 来源
    《Coal Trader》 |2011年第may31期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号