首页> 外文期刊>Journal of Mines, Metals & Fuels >Underground mine entry and development - enhanced productivity and safety
【24h】

Underground mine entry and development - enhanced productivity and safety

机译:地下矿山的进入和开发-提高生产率和安全性

获取原文
获取原文并翻译 | 示例
           

摘要

69% of India's energy balance is dependent on coal-fired power plants. India has a current installed power capacity of 170 GW. Even if we consider a long term projected growth at 8% GDP, to meet the demand growth India has no other alternative, but to increase installed power capacity to 300 GW by 2020.Out of 250 billion tonnes of total reserves only 80 billion tonnes can be effectively mined by opencast mines with the current acceptable stripping ratio. Moreover, getting environment clearance and land acquisition is a lengthy procedure.So to meet the target of UGM coal production of 125 + million tonnes, by 2025 the only option that is left with coal mining industry in India is to introduce mass production technology at a very fast pace. What are the essential desirables for introduction of underground mass production technology?
机译:印度69%的能源平衡取决于燃煤电厂。印度目前的装机容量为170吉瓦。即使我们考虑将GDP的长期增长预期保持在8%,为了满足需求增长,印度别无选择,但要到2020年将装机容量增加到300吉瓦,在2500亿吨的总储量中,只有800亿吨可以在目前可接受的剥采率下由露天矿有效开采。此外,获得环境许可和土地征用是一个漫长的过程。因此,要实现UGM煤炭产量超过125万吨的目标,到2025年,印度煤炭开采行业唯一的选择就是在水泥厂引入大规模生产技术。速度非常快。引入地下批量生产技术的基本要求是什么?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号