...
首页> 外文期刊>Journal of Mining Scinece >Analysis of time-to-time variation of load on interchamber pillars in mines of the Upper Kama Potash Salt Deposit
【24h】

Analysis of time-to-time variation of load on interchamber pillars in mines of the Upper Kama Potash Salt Deposit

机译:上卡玛钾盐矿床井间支柱负荷的时变分析

获取原文
获取原文并翻译 | 示例
           

摘要

The procedure to estimate growth in load exerted on interchamber pillars with time is based on mathematical modeling of stresses and strains in structural elements of room-and-pillar mining method and on roof rock failure criteria. The calculation results illustrate a real time scale of variation in strength of rocks and the associated partial collapse of a parting and failure of edges of interchamber pillars when their height is increased.
机译:估算随时间推移施加在室间支柱上的负载的过程是基于对房柱式采矿方法的结构要素中的应力和应变的数学建模,并且基于顶板岩石破坏准则。计算结果说明了岩石强度变化的实时尺度,以及当其间的高度增加时,相间的部分崩塌和室间支柱边缘的破坏。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号