首页> 外文期刊>Journal of Mining Scinece >IMPLEMENTING A BLENDING OPTIMIZATION MODEL FOR SHORT-RANGE PRODUCTION PLANNING OF CEMENT QUARRY OPERATION
【24h】

IMPLEMENTING A BLENDING OPTIMIZATION MODEL FOR SHORT-RANGE PRODUCTION PLANNING OF CEMENT QUARRY OPERATION

机译:实施水泥采石场近距离生产计划的混合优化模型

获取原文
获取原文并翻译 | 示例
           

摘要

An application of the linear programming based blending optimization model for short-range production planning of the cement raw materials is presented. The benefits of the model are established through a case study of an existing cement manufacturing operation in the northern part of Pakistan. A successful model implementation has ensured significant cost savings, reduced employee time for preparing schedules, a sustained supply of raw materials, and better coordination and engineering control among various divisions of the operation as compared to schedules produced manually.
机译:提出了基于线性规划的混合优化模型在水泥原料短期生产计划中的应用。该模型的好处是通过对巴基斯坦北部现有水泥生产业务的案例研究确定的。与手动生成的计划表相比,成功的模型实施确保了显着的成本节省,减少了准备计划表的员工时间,持续的原材料供应以及运营各个部门之间更好的协调和工程控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号