...
首页> 外文期刊>Journal of mathematical modelling and alogrithms >Complexity of Buffer Capacity Allocation Problems for Production Lines with Unreliable Machines
【24h】

Complexity of Buffer Capacity Allocation Problems for Production Lines with Unreliable Machines

机译:机械不可靠生产线的缓冲能力分配问题的复杂性

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Buffer capacity allocation problems for flow-line manufacturing systems with unreliable machines are studied. These problems arise in a wide range of manufacturing systems and concern determining buffer capacities with respect to a given optimality criterion which can depend on the average production rate of the line, buffer cost, inventory cost, etc. Here, this problem is proven to be NP-hard for a tandem production line and oracle representation of the revenue and cost functions, and NP-hard for a series-parallel line and stepwise revenue function.
机译:研究了带有不可靠机器的流水线制造系统的缓冲能力分配问题。这些问题出现在广泛的制造系统中,并且涉及根据给定的最佳标准确定缓冲能力,该最佳条件可能取决于生产线的平均生产率,缓冲成本,库存成本等。在这里,这个问题被证明是NP-hard用于串联生产线和收入和成本函数的oracle表示,NP-hard用于串联并行的生产线和逐步收益函数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号