...
首页> 外文期刊>Journal of loss prevention in the process industries >Modeling of BP Texas City refinery incident
【24h】

Modeling of BP Texas City refinery incident

机译:BP德州市炼油厂事故建模

获取原文
获取原文并翻译 | 示例

摘要

This paper presents detailed modeling results of the BP Texas City refinery incident. Three different approaches and explosion modeling tools were used to study the event. The results predicted by all three approaches are similar and all approaches identified a hazard potential comparable to what was witnessed on March 23, 2005. This confirms that quantitative risk assessment (QRA) has the ability to model a realistic scenario, and is therefore useful in safety measure design and emergency preparedness decision making to improve overall safety performance. Had QRA been conducted during a management of change (MOC) decision-making process, personnel trailers likely would not have been sited in such close proximity to the process units. The resulting severe consequences would then not have occurred. This work also aims to emphasize the importance of QRA in process safety management. The paper presents the authors' perception of the sequence of events involved in the incident based on the published literature available at the time of writing. It also assesses potential consequences for the perceived sequence of events using a variety of consequence assessment tools. In doing so, the analysis illustrates how this incident could have been prevented in spite of many operational difficulties. The observations and commentary presented in this paper are intended solely for the purpose of process safety enhancement on the basis of the lessons learned. BP has published its own detailed report; the incident is also the subject of a recent investigation by the US Chemical Safety and Hazard Investigation Board, with the CSB's final report being available at http://www.csb.gov/index.cfm?folder = completed_investigations&page = info&INV_ID = 52 (as of April 2007).
机译:本文介绍了BP Texas City炼油厂事故的详细建模结果。使用三种不同的方法和爆炸建模工具来研究事件。三种方法所预测的结果都是相似的,并且所有方法都确定了与2005年3月23日所见证的危害相当的潜在危害。这证实了定量风险评估(QRA)具有对现实情景进行建模的能力,因此可用于安全措施设计和应急准备决策,以提高整体安全性能。如果在变更管理(MOC)决策过程中进行了QRA,则人员拖车可能不会被放置在靠近过程单元的位置。这样就不会发生由此产生的严重后果。这项工作还旨在强调QRA在过程安全管理中的重要性。本文基于撰写本文时已发表的文献,介绍了作者对事件所涉及事件序列的看法。它还使用各种后果评估工具来评估事件序列的潜在后果。通过这样做,分析说明了尽管存在许多操作困难,如何可以预防此事件。本文中提出的意见和评论仅是出于在总结经验教训的基础上提高过程安全性的目的。 BP发布了自己的详细报告;该事件也是美国化学安全与危害调查委员会最近进行调查的主题,CSB的最终报告可在http://www.csb.gov/index.cfm?folder=completed_investigations&page=info&INV_ID= 52(截至2007年4月)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号