首页> 外文期刊>Journal of Hydrology >A project of reuse of reclaimed wastewater in the Po Valley, Italy: Polishing sequence and cost benefit analysis
【24h】

A project of reuse of reclaimed wastewater in the Po Valley, Italy: Polishing sequence and cost benefit analysis

机译:意大利Po Valley再生水回用项目:抛光顺序和成本效益分析

获取原文
获取原文并翻译 | 示例
           

摘要

The paper presents a study carried out in the environmentally sensitive area of the Po Valley in northern Italy, with the aim of evaluating, from technical and economic perspectives, a project to reuse part of the final effluent from the Ferrara wastewater treatment plant for irrigation and to develop the site for recreational purposes.Although this area features plentiful supplies of surface water, the Ministry of the Environment has declared it to be at risk of environmental crises due to eutrophication and the drought recurring over the last decade. Thus the availability of fresh water, particularly for agricultural purposes, is threatened, and prompt water saving and protection measures are required. Hence, the possibility of reusing reclaimed wastewater from this plant was investigated, with the aim of exploiting the space around the WWTP, situated within a large urban park, to install natural polishing treatment systems and create green spaces for recreational use.Based on experimental investigation on a pilot plant (featuring both natural and conventional treatments), the study outlines the rationale behind the treatment train selected for the project, details the initial and ongoing costs involved, evaluates the benefits deriving from the project, and assesses public acceptance of the project by the contingent valuation method. A cost-benefit analysis completes the study, and various economic indicators (net present value, benefit-cost ratio, pay-back period, and internal rate of return) revealed that the proposed project was financially feasible.
机译:本文介绍了在意大利北部Po山谷对环境敏感的地区进行的一项研究,目的是从技术和经济角度评估一个项目,该项目将来自Ferrara废水处理厂的部分最终废水再用于灌溉和灌溉。尽管该地区拥有丰富的地表水供应,但环境部已宣布由于过去十年的富营养化和干旱而面临环境危机的风险。因此,特别是用于农业目的的淡水的供应受到威胁,并且需要迅速的节水和保护措施。因此,对利用该工厂的再生废水进行再利用的可能性进行了研究,目的是开发位于大型城市公园内的污水处理厂周围的空间,以安装天然的抛光处理系统并为休闲娱乐创造绿色空间。在中试工厂(具有自然和常规处理功能)上,研究概述了为该项目选择的处理方法的基本原理,详细介绍了所涉及的初始和正在进行的成本,评估了从该项目中获得的收益,并评估了公众对该项目的接受程度通过或有估值法。成本效益分析完成了该研究,各种经济指标(净现值,收益成本比,投资回收期和内部收益率)表明,该拟议项目在财务上是可行的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号