...
首页> 外文期刊>Coal Americas >It's back to the drawing board for FPL: St. Lucie County says no to coal-fired power plant
【24h】

It's back to the drawing board for FPL: St. Lucie County says no to coal-fired power plant

机译:回到FPL的规划板上:圣露西县对燃煤电厂说不

获取原文
获取原文并翻译 | 示例
           

摘要

Obtaining permission to construct a coal-fired power plant in South Florida can be a difficult endeavor. Just ask Florida Power & Light (FPL), After months of planning and securing approval from St. Lucie County's Zoning Committee, the utility lost its bid to construct a 1,700-megawatt coal-fired power plant November 8 after St, Lucie's county commissioners unanimously voted to deny FPL's zoning request on a 3,000-acre proposed construction site. The commission meeting, a marathon event by any standards, began at 6:00 pm Monday, November 7 and ended 5:00 am the following morning. FPL gave a five-hour presentation to the commissioners toutina the economic and
机译:获得在南佛罗里达州建设燃煤电厂的许可可能是一项艰巨的努力。只需询问佛罗里达电力与照明公司(FPL),经过数月的计划并获得圣露西县划区委员会的批准,该公用事业公司在11月8日露西市县专员St.一致通过后,就竞标建造了一个1,700兆瓦的燃煤电厂投票否决了FPL关于3,000英亩拟议建筑工地的分区要求。佣金会议是一项马拉松赛事,无论如何,它于11月7日星期一下午6:00开始,第二天早晨5:00结束。 FPL向专员图蒂纳(Toutina)的委员们做了五个小时的演讲,

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号