首页> 外文期刊>Journal of Explosives Engineering >Explosive Operations for Constructing a Tunnel Based PCB Collection System
【24h】

Explosive Operations for Constructing a Tunnel Based PCB Collection System

机译:爆炸作业,用于构建基于隧道的PCB收集系统

获取原文
获取原文并翻译 | 示例
           

摘要

In an effort to recover Polychlorinated biphenyls (PCB's) that had leached into bedrock below the Hudson River in Upstate New York, a shaft and tunnel complex was designed that would allow installation of inclined and vertical wells into the zones of contamination to recover PCB's by gravity. A joint venture of Merco Inc., of Lebanon, NJ, and Obayashi Corporation, of San Francisco, CA, was awarded the contract for constructing the first Tunnel Drain Collection System (TDCS) in the world. Conventional drill and blast techniques were the most economical method to construct the project but due to the presence of PCB's and community concerns, innovative drill and blast practices were needed.
机译:为了回收已浸入纽约州北部哈德逊河下方基岩中的多氯联苯(PCB),设计了竖井和隧道综合设施,允许将倾斜和垂直的井安装到污染区中,以通过重力回收PCB 。新泽西州黎巴嫩的Merco Inc.与加利福尼亚州旧金山的Obayashi Corporation的合资企业获得了建造世界上第一个隧道排水收集系统(TDCS)的合同。传统的钻孔和爆破技术是构建项目的最经济的方法,但是由于PCB的存在和社区的关注,因此需要创新的钻孔和爆破方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号