Post-construction settlement estimation and increased earthwork volumes calculation of high loess fill

机译:黄土高填方施工后沉降估算和增加的土方量计算

获取原文
获取原文并翻译 | 示例
       

摘要

In this study, the post-construction settlement (PCS) area distribution of high fill was analyzed based with reference to a case history of an airport runway crossing a deep gully reclaimed by a thick fill of loess. Earthwork volumes (EV) attributed to PCS was calculated based on in-situ tests. Results showed that the uneven PCS were related to fill depth, construction time, fill rate, integrated compaction degree, and boundary conditions. An empirical equation that considers the aforementioned influence factors was established to calculate the final PCS of high fill. The surface PCS of high fill and the EV can be estimated according to the proposed empirical equation and the original site topography using the three-dimensional finite element method.
机译:在这项研究中,参考了机场跑道穿越由厚厚黄土填埋的深沟的机场跑道的病历,分析了高填土的施工后沉降(PCS)区域分布。基于原位测试计算了归因于PCS的土方量(EV)。结果表明,不均匀的PCS与填充深度,施工时间,填充率,整体压实度和边界条件有关。建立了考虑上述影响因素的经验公式,以计算高填充的最终PCS。高填充的表面PCS和EV可以使用三维有限元方法根据建议的经验方程式和原始站点地形来估算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号