...
首页> 外文期刊>Journal of environmental & engineering geophysics >Applying mise-a-la-masse method to determine the length of reinforcement in bored in situ concrete piles
【24h】

Applying mise-a-la-masse method to determine the length of reinforcement in bored in situ concrete piles

机译:应用mise-a-la-mass方法确定钻孔现浇混凝土桩中钢筋的长度

获取原文
获取原文并翻译 | 示例

摘要

The strength of reinforced concrete pile is largely controlled by the steel reinforcement inside the pile. Finding an effective way to determine the length of the steel reinforcement in bored in Situ concrete piles has been an urgent but difficult problem for the construction administration agencies in China. Taking advantage of the significant difference in the electrical conductivity between the steel reinforcement and the concrete pile body, we apply the mise-a-lamasse (MALM) method, which has traditionally been used in ore exploration and coal mining, to determine the reinforcement length of bored in situ concrete piles. Preliminary tests show that the voltage (electrical potential) curve sharply increases at the bottom of the steel reinforcements, where the voltage gradient curve also peaks. Thus, the MALM method could be an effective, fast and convenient way to determine the reinforcement length in bored in situ concrete piles. The MALM method may also be used in the survey of old steel piles, bridge footings and dam foundations whose configurations are not available.
机译:钢筋混凝土桩的强度在很大程度上受桩内钢筋的控制。对于中国的建筑管理机构来说,寻找一种有效的方法来确定钻孔现场混凝土桩中钢筋的长度一直是一个紧迫但困难的问题。利用钢筋与混凝土桩身之间电导率的显着差异,我们采用了传统的矿石勘探和煤矿开采中使用的mise-a-lamasse(MALM)方法来确定钢筋的长度无聊的现场混凝土桩。初步测试显示,电压(电势)曲线在钢筋的底部急剧增加,电压梯度曲线也达到峰值。因此,MALM方法可能是确定钻孔现场混凝土桩中钢筋长度的有效,快速和方便的方法。 MALM方法也可用于对旧钢桩,桥脚和大坝基础不可用的测量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号