首页> 外文期刊>Journal of Failure Analysis and Prevention >Assessment of Structural Steel from the World Trade Center Towers, Part I: Recovery and Identification of Critical Structural Elements
【24h】

Assessment of Structural Steel from the World Trade Center Towers, Part I: Recovery and Identification of Critical Structural Elements

机译:世界贸易中心大厦的结构钢评估,第一部分:关键结构元素的回收和识别

获取原文
获取原文并翻译 | 示例
       

摘要

The National Institute of Standards and Technology conducted a 3-year, USD16 million investigation of the World Trade Center (WTC) disaster in response to the events of September 11, 2001. A primary goal of the WTC investigation was to explore the building materials and the construction and technical conditions that contributed to the outcome of the tragedy. This is one of a series of papers that describe various facets of the investigation involving the recovery and identification of the structural components and the evaluation of the steel with regard to damage and degradation as a result of the events of the day. This paper covers unique aspects of the recovery of the structural elements and the subsequent identification of their original as-built locations within the towers. A total of 236 pieces of WTC steel were cataloged, including several exterior and core columns from the impact and fire floors of WTC 1 and WTC 2.
机译:针对2001年9月11日的事件,美国国家标准技术研究院对世界贸易中心(WTC)灾难进行了为期3年,价值1600万美元的调查。WTC调查的主要目标是探索建筑材料和造成悲剧结果的结构和技术条件。这是一系列论文的其中之一,描述了研究的各个方面,包括恢复和识别结构部件以及评估钢材对日常事件造成的损坏和退化的影响。本文涵盖了结构元素回收的独特方面,以及随后确定塔楼内原始建成位置的信息。总共对236种WTC钢进行了分类,包括来自WTC 1和WTC 2的冲击地板和防火地板的多个外部和核心柱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号