首页> 外文期刊>World Steel News >Aspire Mining (Australia) completes feasibility study into Ovoot project and determines quality of cleaned coal
【24h】

Aspire Mining (Australia) completes feasibility study into Ovoot project and determines quality of cleaned coal

机译:Aspire Mining(澳大利亚)完成Ovoot项目的可行性研究,并确定清洁煤的质量

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In the fourth quarter of 2012 Australia’s Aspire Mining completed feasibility study into its Mongolian Ovoot Project, expanding its resource from 224 mt to 257 mt (ash – 16-36%; CSN – 6-8). The material will be extracted by open-pit and underground mining (0.75 mtpy). The open-pit mine will have an initial capacity of 6 mtpy (from 2016), but it will increase to 12 mtpy of concentrate (from 2018) along with infrastructure development. Open-pit will remain operational for 20 years and underground mine – for 11 years.
机译:2012年第四季度,澳大利亚的Aspire Mining完成了其蒙古Ovoot项目的可行性研究,将其资源从224公吨增加到257公吨(灰分– 16-36%;南航– 6-8)。该材料将通过露天和地下开采(0.75吨/年)进行提取。该露天矿的初始产能为6 mtpy(从2016年开始),但随着基础设施的发展,其精矿的产能将增加至12 mtpy(从2018年开始)。露天开采将持续运行20年,地下开采将持续11年。

著录项

  • 来源
    《World Steel News》 |2013年第34期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号