...
首页> 外文期刊>World Steel Capacity News >Voestalpine.s US plant construction ?is progressing quickly?
【24h】

Voestalpine.s US plant construction ?is progressing quickly?

机译:奥钢联在美国的工厂建设进展迅速?

获取原文
获取原文并翻译 | 示例

摘要

Austria.s Voestalpine has already erected 67 m out of 137 m of direct reduction tower of a 2 million tpy HBI plantat the site near Corpus Christi, Texas. According to the company.s insider, the construction is progressingquickly and the steel structures erection is ongoing. Besides, the source informed Metal Expert that the portfacilities, including a 5 million tpy loading station and a dock at the navigable channel La Quinta extended forinfrastructure optimization in February 2014, will be finished in the upcoming months. The plant will be commissionedin early 2016, according to the schedule.
机译:奥地利的Voestalpine已经在德克萨斯州科珀斯克里斯蒂市附近200万吨/年的HBI工厂的137 m的直接还原塔中架设了67 m。据该公司内部人士称,施工进展迅速,钢结构的安装正在进行中。此外,该消息人士告知《金属专家》,该设施将于2014年2月完工,其中包括一个年产500万吨的装货站和一个可通航的La Quinta航道码头,用于基础设施优化。根据时间表,该工厂将于2016年初投入使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号