...
首页> 外文期刊>World Steel Capacity News >China’s Shandong Iron and Steel Rizhao contracts BLT charging systems for new plant
【24h】

China’s Shandong Iron and Steel Rizhao contracts BLT charging systems for new plant

机译:中国山东日照钢铁公司与新工厂签订BLT装料系统

获取原文
获取原文并翻译 | 示例

摘要

China’s Shandong Iron and Steel Rizhao has contracted Luxembourg’s Paul Wurth for supply of twoBell Less Top charging systems for its two BFs (8.5 million tpy in total) at the new flats plant under constructionin Rizhao, Shandong Province. The BFs with inner volume of 5,100 cu m and capacity of 11,500 tpdis scheduled for commissioning in 2017 and 2018. These furnaces will be the largest ones ever equippedwith a Central Feed BLT, the contractor says in its statement.
机译:中国山东日照钢铁公司已与卢森堡的Paul Wurth签订合同,为其在山东省日照市正在建设的新平板钢厂为其两个高炉提供两个Bellless Top充电系统。高炉内部容积为5,100立方米,产能为11,500 tpdis,计划于2017年和2018年投产。承包商在声明中称,这些高炉将是有史以来最大的配备中央供料BLT的高炉。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号