...
首页> 外文期刊>Drilling Contractor >Abu Dhabi NDC works to drill smarter, expand fleet with refurbishment-upgrade programme
【24h】

Abu Dhabi NDC works to drill smarter, expand fleet with refurbishment-upgrade programme

机译:阿布扎比NDC致力于通过翻新和升级计划来钻探更智能,扩大机队

获取原文
获取原文并翻译 | 示例
           

摘要

ABU DHABI NATIONAL Drilling Company has made sweeping commitments to enhancing drilling performance, improving personnel retention and training, and rigsite safety. The 26-rig contractor (10 jackups and 16 land) is also expanding its fleet, albeit cautiously with an eye toward the market, a company source explained. "Our Rig Integrity Assurance Programme (RIAP), in which all of our older rigs complete a refurbishment and upgrade programme to extend their life span by 15-25 years, offers a cost-effective and safe alternative to procuring new rigs," he said. "We have already completed two rigs, the jackups Al Ittihad and Junana, and intend to carry on at the rate of 1 rig per year." The upgrades included conversion from slot to cantilever and increasing variable deck load. The work took about 8 months on the 2nd rig upgraded, but NDC anticipates that this will be cut to as little as 6 months on future RIAP projects.
机译:阿布扎比国家钻井公司做出了全面的承诺,以提高钻井性能,改善人员保留和培训以及井场安全。该公司消息人士解释说,这家拥有26个钻机的承包商(10个自升式起升机和16个土地)也正在扩大其机队,尽管谨慎地着眼于市场。他说:“我们的钻机完整性保证计划(RIAP),其中所有较旧的钻机都完成了翻新和升级计划,以将其使用寿命延长15-25年,是购买新钻机的一种经济有效且安全的替代方法,”他说。 。 “我们已经完成了自升式钻井平台Al Ittihad和Junana的两个钻机,并打算以每年1台的速度继续进行。”升级包括从插槽到悬臂的转换以及不断增加的甲板负载。在升级的第二台钻机上,该工作花费了大约8个月的时间,但NDC预计,在未来的RIAP项目上,这将减少至仅6个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号