Deepwater cement design optimized for record-length expandable liner in Gulf of Mexico

机译:深水水泥设计针对墨西哥湾创纪录长度的可膨胀衬砌进行了优化

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Solid expandable tubulars offer the industry an excellent solution for gaining a pipe size for completions when well conditions necessitate the setting of additional drilling liner. For operators to take full advantage of expandable liner technology, a successful cementing job is critical. Without a successful cement job, the expandable installation itself can be jeopardized by complicating and, in some cases, preventing remaining well operations from moving forward. For this reason, a well-engineered approach to cementing is vital to obtaining a good cementing result. The engineering needs to begin with the drilling of the hole section and continue through leaving acceptable hole conditions for the liner installation and eventual cementing. Results obtained from this case history provided the opportunity to reach the main zones to be drilled and evaluated and still obtain a satisfactory completion program. Conclusions drawn from this case history and other installations performed are: Proper window preparation and hole cleaning before running expandable casing is recommended. Determine placement time needed based on liner length and expansion cycles required. Perform temperature simulations to determine BHCT and heat-up rate for thickening time required. Prepare a schedule for TT test based on cycles required for motor shutdown (on/off schedule). Perform proper lab testing based on this modified lab schedule for both TT and compressive strength. Perform lab testing to obtain optimum spacer and surfactant design for synthetic-based mud system. Perform engineering simulations using cementing software for proper ECD management during cementing operations. Deliver these designs to the well site with a plan for placement using offshore equipment capabilities. Using these practices has led to excellent results, delivering better wellbore architecture and opportunities to drill deeper wells in deepwater.
机译:固态可膨胀管为行业提供了一个出色的解决方案,可在井况需要设置额外的钻井衬管时获得完整的管道尺寸。对于操作人员来说,要充分利用可膨胀衬管技术,成功进行固井工作至关重要。如果没有成功的水泥工作,可扩展装置本身可能会因复杂化而受到损害,在某些情况下,还可能阻止剩余的油井作业向前发展。因此,精心设计的固井方法对于获得良好的固井效果至关重要。工程需要从钻孔部分开始,并继续为衬管安装和最终固井留下可接受的钻孔条件。从该案例历史中获得的结果提供了机会,可以到达要钻探和评估的主要区域,并且仍然可以获得令人满意的完井计划。从此案例历史记录和执行的其他安装得出的结论是:建议在运行可膨胀套管之前进行适当的窗口准备和孔清洁。根据衬里长度和所需的膨胀周期确定所需的放置时间。进行温度模拟以确定所需的增稠时间的BHCT和升温速率。根据电动机关闭所需的周期,准备TT测试的时间表(开/关时间表)。根据此修改后的实验室时间表对TT和抗压强度进行适当的实验室测试。进行实验室测试,以获得用于合成基泥浆系统的最佳垫片和表面活性剂设计。使用固井软件执行工程仿真,以便在固井作业期间进行正确的ECD管理。通过使用海上设备功能的布置计划,将这些设计交付到井场。使用这些做法已取得了出色的成果,提供了更好的井眼结构,并为深水深井的钻井提供了机会。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号