...
首页> 外文期刊>Diesel progress: International Edition >READY FOR: THEIR CLOSE-UP JCB's Ecomax-powered construction machines debuting in Munich
【24h】

READY FOR: THEIR CLOSE-UP JCB's Ecomax-powered construction machines debuting in Munich

机译:准备:特写JCB的Ecomax动力建筑机械在慕尼黑首次亮相

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

JCB's solution to EU Stage 3b and EPA Tier 4 emissions regulations will be shown for the first time at bauma 2013 as machines powered by the company's Ecomax engine make their debut. The diesels meet Stage 3b/Tier 4 interim emissions levels without the use of diesel particulate filters (DPF) or other aftertreatment. Instead, JCB has met the regulations through, the use of in-cylinder technologies, eliminating the need for any external exhaust aftertreatment - no DPF or additives such as AdBlue - that reduces operating costs, JCB said.
机译:JCB针对EU Stage 3b和EPA Tier 4排放法规的解决方案将在bauma 2013上首次展示,该公司的Ecomax发动机驱动的机器首次亮相。柴油无需使用柴油机微粒过滤器(DPF)或进行其他后处理,即可达到3b / Tier 4过渡期排放水平。 JCB说,相反,JCB通过使用缸内技术满足了法规要求,无需进行任何外部排气后处理-无需DPF或AdBlue之类的添加剂即可降低运行成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号