【24h】

Bowen Pipeline enters FEED

机译:Bowen Pipeline进入FEED

获取原文
获取原文并翻译 | 示例
           

摘要

Arrow Energy announced that its Bowen Pipeline has entered its FEED stage. The pipeline intends to supply coal seam gas to a hub 22 km (13.7 miles) west of Gladstone in order to supply the three liquefaction facilities there that are nearing the end of their construction. WorleyPar-sons is carrying out the FEED. The pipeline received environmental approval in October.
机译:Arrow Energy宣布其Bowen Pipeline已进入FEED阶段。该管道打算向Gladstone以西22公里(13.7英里)的枢纽供应煤层气,以向那里即将建造结束的三个液化设施供气。 WorleyPar-sons正在执行FEED。该管道在十月份获得了环境批准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号