首页> 外文期刊>Zeus liquefied natural gas report >Blackout underscores India's need for Dabhol
【24h】

Blackout underscores India's need for Dabhol

机译:停电突显了印度对达博尔的需求

获取原文
获取原文并翻译 | 示例
           

摘要

On the same day that GAIL India announced it would commission its Dabhol LNG terminal by the end of November, India experienced its worst power grid failure in a decade, cutting electricity supplies to nearly 360 million people in seven northern states and shutting transport networks, triggering commuter chaos and halting water supplies. As a result, three of India's five transmission grids collapsed, cutting power to states where some 670 million people live, more than half of the country's population. The July 30 blackout followed a similar one the previous day.
机译:在GAIL印度宣布将于11月底投入使用的达博尔LNG接收站的同一天,印度经历了十年来最严重的电网故障,切断了北部七个州近3.6亿人的电力供应,并关闭了交通网络,触发了通勤混乱和水供应中断。结果,印度五个输电网络中的三个崩溃了,切断了向约6.7亿人居住的邦的电力供应,占该国人口的一半以上。 7月30日的停电与前一天类似。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号