首页> 外文期刊>Zeus liquefied natural gas report >BG Group considering third train at QCLNG project
【24h】

BG Group considering third train at QCLNG project

机译:BG集团考虑在QCLNG项目上进行第三次列车

获取原文
获取原文并翻译 | 示例
           

摘要

BG Group is considering developing a third LNG production train at the Queensland Curtis LNG project, Plans reported. The timing of the proposed expansion has not been determined. The company has 23 tcf of gas resources in Queensland, including 9.9 tcf of proven and probable coalseam gas reserves. "Certainly we have the resources there and we're systematically developing them to supply our existing two trains and hopefully in the future a third train," Houston said.
机译:据计划报道,BG集团正在考虑在昆士兰州柯蒂斯LNG项目上开发第三条LNG生产线。拟议扩张的时间尚未确定。该公司在昆士兰州拥有23 tcf的天然气资源,包括9.9 tcf的已探明和可能的煤层气储量。休斯顿说:“当然,我们在那里有资源,我们正在系统地开发它们,以提供我们现有的两列火车,并希望将来提供第三列火车。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号