首页> 外文期刊>Zeus liquefied natural gas report >Pakistan shelves import projects, to restart tender process
【24h】

Pakistan shelves import projects, to restart tender process

机译:巴基斯坦搁置进口项目,重启招标程序

获取原文
获取原文并翻译 | 示例
           

摘要

Pakistan is restarting the LNG import tender process, cancelling plans for two LNG import projects in the country, Ship & Bunker reported. The decision was in response to what the government calls irregularities and a lack of transparency in the previous proposals. The previous proposals include plans for the import of 200 MMcf/d in one terminal and 400 MMcf/d at the other. The decision was made by the new government that came to power this year. The previous proposals were designed during the previous regime, which viewed the projects as necessary to meet the nation's growing energy needs. Reportedly, transparency and regulatory rules were set aside during the previous regime.
机译:Ship&Bunker报道,巴基斯坦正在重新启动LNG进口招标程序,取消了该国两个LNG进口项目的计划。该决定是对政府所谓的违规行为以及先前提案中缺乏透明度的回应。先前的建议包括在一个终端中导入200 MMcf / d,在另一个终端中导入400 MMcf / d的计划。该决定是由今年上任的新政府做出的。先前的提议是在上届政权期间设计的,前任政权认为这些项目是满足美国不断增长的能源需求所必需的。据报道,在上一个政权期间,透明度和监管规则被搁置了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号