...
首页> 外文期刊>Daily Oil Bulletin >Project Efficiency, Learning Curve Key Cost Issues For SAGD Projects
【24h】

Project Efficiency, Learning Curve Key Cost Issues For SAGD Projects

机译:项目效率,了解SAGD项目的关键曲线成本问题

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Rising material and labour costs are not the primary causes of huge cost escalations in steam assisted gravity drainage oilsands projects, according to George Brindle, manager of facilities engineering at Laricina Energy Ltd.Speaking at the Annual Oil Sands Trade Show and Conference in Edmonton last month, Brindle said an analysis of in situ projects developed in Alberta since the mid 1990s refutes the "myth" of spiraling costs for steel and workers, while raising questions about how efficiently the projects are being designed and constructed.
机译:Laricina Energy Ltd.设施工程经理George Brindle表示,不断上升的材料和人工成本并不是蒸汽辅助重力排水油砂项目成本大幅上涨的主要原因。在上个月于埃德蒙顿举行的年度油砂贸易展和会议上发表讲话布林德尔说,对自1990年代中期以来在艾伯塔省开发的原位项目进行的分析驳斥了钢铁和工人成本不断攀升的“神话”,同时引发了有关项目的设计和建造效率的疑问。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号