首页> 外文期刊>CIM Magazine >Ore pass database: Quebec underground metal mines
【24h】

Ore pass database: Quebec underground metal mines

机译:矿石通行证数据库:魁北克地下金属矿

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In underground mines, material handling systems rely on a network of vertical or steeply inclined ore and waste passes. The design and operation of ore pass systems is often based on past experience, which can be anecdotal and, at times, contradictory in nature. This paper provides quantifiable information on ore pass practice and performance in Quebec underground metalliferous mines. The presented field data were derived during a series of site visits in ten underground mines from 2001 to 2003 (see Table). In order to provide a standard methodology to quantify current practice, an extensive questionnaire was developed. At every site, underground assessments were complemented by data collection (design, engineering, problems encountered, and the success or failure of different interventions to restore flow) and site interviews with key mine personnel from the engineering, production, safety, and training departments. This paper reports the analyses of the collected data and, in particular, design practice, material properties, and, the overall performance of ore and waste pass systems. Separate ore pass-waste pass systems are the norm in Quebec underground mines. The use of LHDs with large-capacity buckets implies that it is possible to dump large rock fragments in the ore passes. This can be prevented if the mucking crew follows strict guidelines to transfer larger rock fragments for secondary blasting, or by installing well-designed screening equipment (scalpers, grizzlies) at dump points.
机译:在地下矿山中,物料处理系统依赖于垂直或陡峭倾斜的矿石和废物通道的网络。矿石通道系统的设计和操作通常基于过去的经验,这可能是轶事,有时甚至是矛盾的。本文提供了有关魁北克地下含金属矿山的矿石通过实践和性能的定量信息。所提供的现场数据是在2001年至2003年期间对十个地下矿井进行的一系列实地访问期间得出的(请参见表)。为了提供量化当前实践的标准方法,开发了广泛的调查表。在每个站点,地下评估都辅以数据收集(设计,工程,遇到的问题以及采用不同干预措施以恢复流量的成败)以及对来自工程,生产,安全和培训部门的主要矿山人员进行的访谈。本文报告了对收集到的数据的分析,尤其是对设计实践,材料特性以及矿石和废料通过系统的整体性能的分析。在魁北克地下矿山中,通常采用单独的矿石通过-废物通过系统。将LHD与大容量铲斗配合使用意味着可以将较大的碎石堆放到矿石通道中。如果卸泥人员遵循严格的准则来转移较大的碎石进行二次爆破,或者在倾卸点安装了精心设计的筛分设备(黄牛,灰熊),则可以避免这种情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号