首页> 外文期刊>Hydrocarbon Processing >Project execution risk management for addressing constructability
【24h】

Project execution risk management for addressing constructability

机译:项目执行风险管理,以解决可施工性

获取原文
获取原文并翻译 | 示例
           

摘要

The Construction Industry Institute (CII) defines constructability as "the optimum use of construction knowledge and experience in planning, design, procurement, and field operations to achieve overall project objectives." This emphasizes the importance of putting construction insight to work early in project development and integrating that knowledge with the conceptual, design and procurement phases to allow for the most efficient, practical and, hence, cost-efficient construction techniques. CII claims that adopting a construction-focused methodology increases the chance of achieving: 1. Reduction in total project costs 2.Accelerated schedule to project completion 3. Enhanced plant maintainability, reliability and operability 4.Selection of safest designs and construction methods.
机译:建筑工业协会(CII)将可施工性定义为“最佳地利用建筑知识和经验进行规划,设计,采购和现场操作,以实现总体项目目标。”这强调了必须在项目开发的早期阶段使施工洞察力发挥作用,并将该知识与概念,设计和采购阶段相集成的重要性,以允许采用最有效,最实用,因此具有成本效益的施工技术。 CII声称采用以施工为中心的方法会增加实现以下目标的机会:1.降低项目总成本2.加快项目完成进度3.增强工厂的可维护性,可靠性和可操作性4.选择最安全的设计和施工方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号