首页> 外文期刊>Hydrocarbon Processing >Eliminating the risks to starting up your plant right the first time
【24h】

Eliminating the risks to starting up your plant right the first time

机译:消除首次启动工厂的风险

获取原文
获取原文并翻译 | 示例
       

摘要

Contracts these days go way past the typical project end point and require contractors to commission the systems,start up the plant,ramp up production and bring the plant to full design capacity.They require contractors to deliver an operating plant to the level of full production-demonstrating its process capability and reliability,certifying its capacity and validating that the plant is capable of delivering product to market.Such a process may include a 7-day production acceptance test and a 90-day reliability test before handover,plus a 1-yr warranty period thereafter.So why are owners expecting more from their engineering,procurement,construction(EPC)contractors? Increased availability equals increased profit.The longer it takes to bring the plant online and without interruption,the more the owner's return on capital employed(ROCE)is reduced.Time is money.
机译:这些天的合同已经超出了典型项目的终点,要求承包商调试系统,启动工厂,提高生产并使工厂达到满负荷设计能力。他们要求承包商将运营工厂交付到满负荷生产水平-证明其过程能力和可靠性,证明其能力并确认该工厂有能力将产品交付市场。此类过程可能包括交付前7天的生产验收测试和90天的可靠性测试,以及1-保修期过后。为什么业主希望他们的工程,采购,建筑(EPC)承包商有更多的期望?可用性的提高等于利润的增加。使工厂上线且不受干扰的时间越长,所有者所使用的资本回报率(ROCE)减少的就越多。时间就是金钱。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号