首页> 外文期刊>Hydrocarbon Processing >Petroperu Talara Refinery Modernization Project, Talara, Peru
【24h】

Petroperu Talara Refinery Modernization Project, Talara, Peru

机译:Petroperu塔拉拉炼油厂现代化项目,秘鲁塔拉

获取原文
获取原文并翻译 | 示例
       

摘要

To increase the production of low-sulfur refined transportation fuels, Peru is expanding and modernizing its Talara refinery. The $3.5-B project will allow the refinery to meet new sulfur requirements for gasoline and diesel, as well as increase the facility's flexibility to process heavier crudes. The plant's refining capacity will increase from 62 Mbpd to 95 Mbpd. The project includes the expansion and modification of existing processing units, such as the CDU, the catalytic cracking complex and the vacuum distillation unit (VDU). New processing units will also be constructed onsite. These units include a diesel hydrotreater, a cracked naphtha hydrotreater, a VDU, a flexicoker, a naphtha hydrotreater, a naphtha catalytic reformer, an amine unit and a cogeneration unit.
机译:为了增加低硫精炼运输燃料的产量,秘鲁正在扩大其塔拉拉炼油厂并使之现代化。 $ 3.5-B的项目将使精炼厂能够满足汽油和柴油的新硫要求,并提高了工厂处理重质原油的灵活性。该工厂的精炼能力将从62 Mbpd提高到95 Mbpd。该项目包括扩建和改造现有的处理单元,例如CDU,催化裂化装置和真空蒸馏单元(VDU)。新的处理单元也将在现场建造。这些单元包括柴油加氢处理机,裂化石脑油加氢处理机,VDU,柔焦机,石脑油加氢处理机,石脑油催化重整器,胺单元和热电联产单元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号