首页> 外文期刊>Hydrocarbon Processing >Cheniere ramps up new LNG strategies
【24h】

Cheniere ramps up new LNG strategies

机译:Cheniere加强了新的液化天然气战略

获取原文
获取原文并翻译 | 示例
       

摘要

In June, Cheniere Energy Inc. revealed plans for two significant LNG project developments that are expected to add up to 19 MMtpy of incremental LNG production capacity and bring Cheniere's aggregate nominal LNG production capacity to 60 MMtpy by 2025. At present, Cheniere has a total of five liquefaction trains under construction at its Sabine Pass facility in Cameron Parish, Louisiana (FIG. 1). The Sabine Pass project is fully permitted for up to six trains, each with a nominal LNG production capacity of 4.5 MMtpy, bringing the total LNG production capacity of the project to 27 MMtpy.
机译:今年6月,Cheniere Energy Inc.透露了两个重大LNG项目开发的计划,这些计划有望使LNG的新增产能增加19 MMtpy,到2025年,Cheniere的LNG总名义生产能力将达到60 MMtpy。位于路易斯安那州卡梅伦教区的Sabine Pass工厂正在建造的5座液化火车中的5座(图1)。完全允许Sabine Pass项目使用六列火车,每列火车的名义LNG生产能力为4.5 MMtpy,从而使该项目的LNG总生产能力达到27 MMtpy。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号